Gulberg Residencia (IBECHS-Phase iii) is located in Zone 05, Islamabad. The CDA approved a housing project comprising consolidated land of 19,390.36 kanals.  These residential plots are available with cash payments and installments. Approximately 500 + plots Owners have started construction on their plots, and approximately 300+ families have shifted to their own houses. The construction of houses in Gulberg Residencia is in full swing.

Gulberg Residencia NOC:

The Capital Development Authority issued an NOC via its letter no. CDA/PLW/HS-(127)2020/Vol/V/23 dated June 7, 2020.

Gulberg Residencia Location:

The only society in Islamabad with the most acceptable, nearby, and convenient distances from the twin cities makes it a dominant society where many people prefer to invest, stay, and live. It is situated a 5-minute drive from the Islamabad expressway through the 220-foot-wide main boulevard. In terms of location, Gulberg Residencia is located much better than the other housing societies.

Gulberg Residencia Location

Gulberg Residencia Location

Gulberg Residencia Map:

GRI consists of Blocks AA, A, B, C, E, F, G, H, I, J, K, L, M, N, O, P-1, P-2, P-3, P-4, Q, R, S, T, V, A-Executive, E-Executive, and F-Executive.

Plot Sizes:

Gulberg Residencia Islamabad has residential plots of 5 marla (25×50), 7 marla (30×60), 10 marla (35×70), 12 marla (40×80), 1 kanal (50×90), and 2 kanal (75×120).

Development Status:

Gulberg Residencia Islamabad, Block AA, A, B, C, E, F, G, H, I, J, K, L, M, N, O, P-1, P-2, P-3, P-4, Q, R, S, T, V, A-Executive, E-Executive, and F-Executive.

  • The development work is complete for one kanal plot in Block A. The development of the rest of the block is still in progress.
  • The development work is well underway in Block B, but a lot of work is still to be accomplished.
  • Block C, L, and T are almost fully developed; 90% of the work has been accomplished.
  • Blocks E, F and I are fully developed, and properties are also being constructed rapidly.
  • Blocks J and G are only 60 and 80 percent, respectively, developed, and the work is in quick progress.
  • Development work in block H for 10 Marla plots is complete but is in progress for 7 Marla plots. Land acquisition for some parts is in progress.
  • The land has been acquired for blocks K, N, and O, and the development will start soon.
  • Block M is being developed, and a lot of development has been achieved.
  • Development work has taken place again in Block P.
  • Development in blocks Q, R, and S is well underway; 50% of the work is achieved.
  • Block V is 60% developed, and the land area is still to be transferred in the project’s name.

A-Block: Gulberg Residencia

The developer has announced possession in Block A of plot sizes 7 marlas, 10 marlas, and 1 kanal plot. The remaining 58% of the land is underdeveloped or non-developed.  The developer doesn’t have possession of the remaining 2% area (close to the village) of the block. These plot owners will likely be adjusted in the grand executive block.  

B-Block: Gulberg Residencia

Development work in Block B on a few plots of 1 kanal (50×90) has been completed, and possession of these has been announced. Work on the remaining area of Block B has yet to kick off. Sources have confirmed that the land here is partially clear of any litigation issues. It is expected that as soon as related machinery engaged in other blocks is available, development work will kick off. Otherwise, these plot owners will likely be adjusted in the grand executive block.

C-Block: Gulberg Residencia

Development work in Block C has been almost completed, and possession has also been granted. The remaining land has recently been cleared of litigation. The developer has yet to resume completing the development of this piece of land. Recently, the developer launched 5 Marla and 7 Marla development and possession plots on cash payment in Block C.

E-Block: Gulberg Residencia

It is among the few Gulberg Residencia blocks where development work has been completed and possession is available throughout. Block E is popular among end-users looking to construct their homes soon. Demand, in comparison with other blocks, is relatively high as there are limited plots for sale in this block.

F-Block: Gulberg Residencia

Development work here has been completed in Block F on 90% of the sold land, while possession has also been granted to the respective owners. The block is popular among genuine buyers eyeing smaller plot sizes like 30×60 and 35×70; that’s also the reason why as many as 60 houses are under construction or completed here.

G-Block: Gulberg Residencia

For some reason, the developer hasn’t started to resume construction work in Block G on the 80% of the land awaiting it. The land was recently freed from the local settlers. There is no news on how soon the development focus will shift to this block, explaining the comparatively lower property rates. The rates have nonetheless decreased since our last update.

H-Block: Gulberg Residencia

Block H’s 40% land is in serious litigation, and it is expected that the developer will adjust these plots in the grand executive block. The remaining 40% of the area is underdeveloped, and 20% is fully developed. Block H does not have any good access from any main road, only access from Block O, Block G, and Block F.

I-Block: Gulberg Residencia

The block is popular among end-users looking for plots of smaller size. At the moment, Block I is home to many families. The location of Block I is also considered prime and nearest to D. Markaz.

J-Block: Gulberg Residencia

While the developer has acquired 100% of the land in Block J, development work has only been completed on 80% of the block’s area. The possession of developed plots has also been granted. At the moment, the construction of a few houses is underway. The development work on the remaining 20% is in full swing.

K-Block: Gulberg Residencia

Development work here has kicked off in Block K and the good news is that a deal between the developer and landowners has been finalized. The settlers will be moved soon. The development work will be completed soon on recently acquired land. The remaining development work will kick off soon in parallel with Block L and Block V areas.

L-Block: Gulberg Residencia

Development work in Block L has been completed by 90%, while possession of the developed plots has also been granted. On the remaining 10%, work to level the ground is being carried out. The block is home to only one family, while the construction of 60 units is underway or completed.

M-Block: Gulberg Residencia

Block M is free from litigation, and that’s even though development work here has been completed on 25% of the area. The developer recently announced possession of a few plots measuring 7 marlas in Block M. Since the developer has other blocks on its priority list for completing development work, similar activity here isn’t expected right away.

N-Block: Gulberg Residencia

The developer has not acquired land from landowners for development in Block N. The previously developed 5% of the total area is all that has been done so far. On top of that, no information is available on how soon we should expect the developer to acquire land in Block N.

O-Block: Gulberg Residencia

The block features approximately 130 plots, and possession has been granted for only a few plots of size 10 marla (35×70). In Block O Development work in the remaining area is yet to kick off, but the bad news is that a deal between the developer and landowners has not been finalized. The settlers will be moved soon, allowing the developer to kick-start development work.

P-Block: Gulberg Residencia

Only 5% of Block P is in litigation, while work on the remaining land in P-1 and P-2 is underway. The machinery is currently busy leveling the terrain and cutting the plots. In P-3 and P-4, development work is yet to kick off, but the good news is that a deal between the developer and landowners has been finalized. The settlers will be moved soon, allowing the developer to kick-start development work. It is among the most happening blocks, as rates here are low due to its location towards the edge of society. However, the block is high and thus considered good by some.

Q-Block: Gulberg Residencia

It is one of the blocks where development work is currently underway, and since only 40% of it has been developed so far, property demand for these plots is lukewarm. The pace of ongoing work is very slow, but the fact is that Block Q has no land in litigation.

R-Block: Gulberg Residencia

Block R is developed by 20%, and possession of these plots is also available. Work on the remaining 80% of the land is on hold as the land is in serious litigation; in Block R it is much more likely that the situation will settle in favor of society. As and when possession of land is retrieved, development work will kick off.

S-Block: Gulberg Residencia

This Block S features 1-Kanal plots alone, so transaction volume is comparatively low. The block is clear from all litigation, so the ongoing development work should be completed soon.

T-Block: Gulberg Residencia

The entire block is free from litigation issues, and it is likely that as soon as work in Block K is completed, machinery will be moved to Block T. Due to this reason, the demand for plots in Block T is very high.

V-Block: Gulberg Residencia

Block V is 10% in litigation, while development work here has been completed by 50%. The good part is that in Block V, work is underway on the 40% of land cleared from litigation. The owners of plots in litigated parts will be adjusted in the grand executive block. The expected new block will have a prime location, so there is nothing to worry about.

E-Executive and F-Executive Blocks: Gulberg Residencia

E-Executive and F-Executive Blocks are planned near Sector G, where the society has reportedly purchased about 7,000 kanal of land. Earlier, Gulberg Residencia (IBECHS) launched Sector A Executive a few years ago, which lies close to Sector A. Although possessions have not been given in that block yet, the location is good and demand is high in that area. In this Block, plots are available on cash payment and the 3-year installment plan.

A-Executive-ii Block: Gulberg Residencia

A-Executive-ii block is planned near Sector A and Block A Executive, where the society has reportedly purchased about 6,000 kanal of land. Earlier, the developer launched Sector A Executive a few years ago, which lies close to Sector A. Although possessions have not been given in that block yet, the location is very good, and demand is so high in that area. In this block, plots are available on a 3-year installment plan.

Commercial projects in Gulberg Islamabad:

Commercial projects in Gulberg, Islamabad, are going to mimic the central business hub of the capital city. Similarly, business districts in Gulberg are going to be a great location for new businesses, and many businesses have already started functioning. Some of the famous projects in Gulberg are:

  • Gulberg Mall & Signature Living
  • Samama Star Mall and Residency
  • Prism Heights
  • Luxus Malls and Residencies
  • AJ Towers
  • Gulberg Arena
  • Gulberg Heights
  • Diamond Mall and Residency
  • Serene Heights
  • Sky ParkOne
  • HM Tower
  • Corporate Center
  • Gulberg Trade Center
  • Gulberg Icons 1 and 2
  • Gulberg Emporium
  • Karakoram Greens
  • Gulberg Twin Tower
  • Gulberg Marina
  • Sparco Tower
  • Aries Tower
  • Kazani 3
  • Gulberg Rabi Center
  • Magnus Mall
  • Gulberg Pride
  • Madni Square
  • Opal Square

Amenities:

Gulberg Islamabad is the destination of your aspirations. We have it all: a lavish lifestyle, a pollution-free environment, and all of life’s requirements. The residential area is conveniently located near top-tier schools, hospitals, commercial hubs, shopping malls, hotels, and other amenities. 

  • Educational Institutes (Riphah International University)
  • Health Centers and Pharmacies
  • Guards and Mobile patrol security
  • Parks and Walkways
  • Water Filtration Plants
  • CCTV Surveillance
  • Central Commercial Center and D Markaz

FAQS :

Al Madina Estate & Builder

Muhammad Imran Rasheed

Office # 105, 2nd Floor, HM Tower, Business Park, Gulberg Green, Islamabad

+92-300-3690000

+92-333-3690000

Email: info@almadinaestate.com